PROPOSED EVERGREEN TOWNSHIP 2022 ROAD PROJECTS

 Road contracts signed for 2023 contract year.

1. Three applications of chloride on local roads 40.24 miles @1.650 GPM x 3
applications x $0.180/gallon = $35,853.84
2. Asphalt overlay Staines Road to Stevenson Road (1.0 mile) = $120,317.00 (road
commission to deduct $50,000.00 from this total) = $70,317.00
3. Brush spray along roadsides to be determined. Cost to be shared, the road
commission to contribute $2,000 to match township contribution. = $,2000.00
4. Provide eighty (80) hours of ditching along local roads. Locations to be
determined by the township and road commission = $10,000.00
5. Gravel re-surface Senator Road from Pakes Road to CR522 (0.95 Miles) to be
shared with Crystal Township. Evergreen Township share = $7,234.00
6. Limestone resurface Beardsley Road from Stevenson Road to Townhall Road
(0.75 Mi) = $41,395.00
7. Limestone resurface Beardsley Road from Staines Road to Stevenson Road (1.25
Mi) = $68,992.00 (Road Commission to deduct $13,000 price for gravel
resurface mile) = $55,992.00
8. Overband crack seal locations to be determined by township and road
commission. 7,500 lbs crack seal emulsion = $8,775.00
Total to be spent on road projects $231,567.34 for 2023-2024

EVERGREEN TOWNSHIP 2021 ROAD PROJECTS

The following roads contracts were signed for 2020:

  1. Spray brush along local roadsides to be determined by township and road commission = $2,000

  2. Gravel resurface Stevenson Road from Sidney Road to Colby Road (1.0 Mile) = $17,360

  3. Gravel Resurface with limestone Townhall Road from Condensery Road to Muskrat Road (1.0 Mile) = $46,142

  4. Machine wedge and sealcoat on Holland Lake Road from Stevenson Road to Townhall Road (1.0 Mile) = $27,957

  5. Sealcoat with fog seal Dorothy Bowen Drive from Holland Lake Road to the end (0.50 Miles) = $6,331

  6. Sealcoat with fog seal Holland Lake Road from Townhall Road North to Wicker Road (1.0 Mile) = $18,089

  7. Sealcoat with fog seal Staines Road from Sidney Road North to end of pavement (0.25 Miles) = $4,404

  8. Three applications of chloride on local roads at the rate of 1,650 gallons per mile (39.95 Miles) = $34,606.69

  9. Provide forty (40) hours of ditching along local roads. Locations determined by the Township and MCRC = $5,000

EVERGREEN TOWNSHIP 2023 ROAD PROJECTS

  • Road contracts signed for 2023 contract year.

  1. Three applications of chloride on local roads 40.24 miles @1.650 GPM x 3 applications x $0.180/gallon = $35,853.84

  2. Asphalt overlay Staines Road to Stevenson Road (1.0 mile) = $120,317.00 (road commission to deduct $50,000.00 from this total) = $70,317.00

  3. Brush spray along roadsides to be determined.  Cost to be shared, the road commission to contribute $2,000 to match township contribution. = $,2000.00

  4. Provide eighty (80) hours of ditching along local roads.  Locations to be determined by the township and road commission = $10,000.00

  5. Gravel re-surface Senator Road from Pakes Road to CR522 (0.95 Miles) to be shared with Crystal Township.  Evergreen Township share = $7,234.00

  6. Limestone resurface Beardsley Road from Stevenson Road to Townhall Road (0.75 Mi) = $41,395.00

  7. Limestone resurface Beardsley Road from Staines Road to Stevenson Road (1.25 Mi) = $68,992.00 (Road Commission to deduct $13,000 price for gravel resurface mile) = $55,992.00

  8. Overband crack seal locations to be determined by township and road commission. 7,500 lbs crack seal emulsion = $8,775.00

Total to be spent on road projects $231,567.34 for 2023-2024