EVERGREEN TOWNSHIP 2025 ROAD PROJECTS
​ROAD CONTRACTS BETWEEN MONTCALM COUNTY ROAD COMMISSION AND EVERGREEN TOWNSHIP FOR 2024-2025 SEASON
1. Limestone gravel resurface Sevenson Road from CR 510 (Sidney Road to Colby Road ~ 1 mile $60,799.00
2. Brush Spray along local roadsides to be determined. Costs to be shared by the road commission-$2000.00
3. Sealcoat with fog seal on Colby Road from Stevenson Road to Townhall Road ~ 1 Mile $18,865.00
4. Three applications of Chloride on local roads in Evergreen Township 39.67 miles @ 1,650 GPMx 3 applications x $0.18/gallon $35,345.97
5. Limestone gravel resurface Stevenson Road from CR506 (Condensery Rd) to Muskrat Rd ~ 1 Mile $60,799.00
6. Sealcoat with fog seal on Beardsley Road, Staines Road and Muskrat Road from Village of Sheridan limits to Stevenson Road ~ 1.75 Miles $33,536.00
7. Ditching, locations to be determined by road commission and the township ~ $7,518.00
8. Limestone gravel resurface Stevenson Rod from Muskrat Road to Holland Lake Road ~ 1.2 miles $67,893.00
TOTAL to be spent on road projects: $286,755.97 for 2025-2026
MINUS : $100,000.00 Road Commission match via Montcalm County
MINUS: $60,000.00 DTE escrow ok’d to disburse
Township Total Cost from Township Geneal Funds: $126,755.97
EVERGREEN TOWNSHIP 2024 ROAD PROJECTS
ROAD CONTRACTS BETWEEN MONTCALM COUNTY ROAD COMMISSION AND EVERGREEN TOWNSHIP FOR 2024-2025 SEASON
1. THREE applications of chloride on local roads at a rate of 1,650 gallons per mile 39.67 MI @1,650 GPM x 3 appllications = $35,345.97
2. Limestone resurface Pakes Rd from M-66 (Sheridan Road) East 1.0 Mile $60,509
3. Sealcoat with fog seal on Colby Road from Staines Road to Stevenson Road 1.0 Mile $18,629
4. Asphalt overlay on Beardsley Road from Sheridan City Limit east to end of pavement .25 Mile $31,462
5. Provide Forty (40) hours of ditching along local roads, locations to be determined by the township and MCRC $5,000
6. Asphalt overlay on Holland Lake Road from Vickeryville Road to Senator Road 0.5 Mile $90,938
Total to be spent on road projects $207,373.97 for 2024-2025
EVERGREEN TOWNSHIP 2023 ROAD PROJECTS
​ROAD CONTRACTS BETWEEN MONTCALM COUNTY ROAD COMMISSION AND EVERGREEN TOWNSHIP FOR 2023 SEASON
-
Three applications of chloride on local roads 40.24 miles @1.650 GPM x 3 applications x $0.180/gallon = $35,853.84
-
Asphalt overlay Staines Road to Stevenson Road (1.0 mile) = $120,317.00 (road commission to deduct $50,000.00 from this total) = $70,317.00
-
Brush spray along roadsides to be determined. Cost to be shared, the road commission to contribute $2,000 to match township contribution. = $,2000.00
-
Provide eighty (80) hours of ditching along local roads. Locations to be determined by the township and road commission = $10,000.00
-
Gravel re-surface Senator Road from Pakes Road to CR522 (0.95 Miles) to be shared with Crystal Township. Evergreen Township share = $7,234.00
-
Limestone resurface Beardsley Road from Stevenson Road to Townhall Road (0.75 Mi) = $41,395.00
-
Limestone resurface Beardsley Road from Staines Road to Stevenson Road (1.25 Mi) = $68,992.00 (Road Commission to deduct $13,000 price for gravel resurface mile) = $55,992.00
-
Overband crack seal locations to be determined by township and road commission. 7,500 lbs crack seal emulsion = $8,775.00
Total to be spent on road projects $231,567.34 for 2023-2024