PROPOSED EVERGREEN TOWNSHIP 2022 ROAD PROJECTS

The following roads contracts were signed for 2022:

  1. Chloride gravel roads three (3) applications 39.95 Miles @ 1,650 GPM X 3 applications X $0.175/gallon = $34,606.69. Applied around Memorial Day, 4th of July and Labor Day

  2. Asphalt overlay on Colby Road from Staines Road to Stevenson Road (1.0 Mile) = $83,334 (minus 20% discount from MCRC)

  3. Asphalt overlay on Colby Road from Stevenson Road to Town hall Road (1.0 Mile) = $87,583 (minus 20% discount from MCRC)

  4. Spray brush along local roadsides to be determined by township and road commission = $2,000

  5. Provide eighty (80) hours of ditching along local roads. Locations to be determined by the township and road commission 80 hours @ $125 per hour = $10,000

  6. Machine wedge and seal on Holland Lake Road from Staines Road to Stevenson Road with remove/replace asphalt at the Evergreen Extension Drain = $33,488 (Minus 15% discount from MCRC)

  7. Limestone Townhall Road from Muskrat Rd to Holland Lake Rd. (1.0 Mile) = $41,691.65. (Minus 15% discount from MCRC)

  8. Rotomill and pave Staines Road from Beardsley Road to Muskrat Road (0.5 Mile) = $78,269. (Minus 20% discount from MCRC)

EVERGREEN TOWNSHIP 2021 ROAD PROJECTS

The following roads contracts were signed for 2020:

  1. Spray brush along local roadsides to be determined by township and road commission = $2,000

  2. Gravel resurface Stevenson Road from Sidney Road to Colby Road (1.0 Mile) = $17,360

  3. Gravel Resurface with limestone Townhall Road from Condensery Road to Muskrat Road (1.0 Mile) = $46,142

  4. Machine wedge and sealcoat on Holland Lake Road from Stevenson Road to Townhall Road (1.0 Mile) = $27,957

  5. Sealcoat with fog seal Dorothy Bowen Drive from Holland Lake Road to the end (0.50 Miles) = $6,331

  6. Sealcoat with fog seal Holland Lake Road from Townhall Road North to Wicker Road (1.0 Mile) = $18,089

  7. Sealcoat with fog seal Staines Road from Sidney Road North to end of pavement (0.25 Miles) = $4,404

  8. Three applications of chloride on local roads at the rate of 1,650 gallons per mile (39.95 Miles) = $34,606.69

  9. Provide forty (40) hours of ditching along local roads. Locations determined by the Township and MCRC = $5,000

EVERGREEN TOWNSHIP 2020 ROAD PROJECTS

The following roads contracts were signed for 2020:

  1. Replace the existing culverts with two 77" x 52" elliptical corrugated metal culvert on Holland Lake Road west of Stevenson Road  = $9,170

  2. Machine wedge and seal Holland Lake Road from M-66 (Sheridan Road) to Staines Road (1.0 Mile) = $35,456

  3. Gravel resurface Evergreen Road from Stevenson Road to Townhall Road (1.0 Mile) = $17,331

  4. Spray brush along local roadsides to be determined by township and road commission = $2,000

  5. Gravel resurface Evergreen Road from Townhall Road to Cedar Lake Road (1.50 Miles) = $25,997

  6. Provide forty (40) hours of ditching along local roads. Locations to be determined by the Township and MCRC = $5,000